GPJ Consulting Engineers were employed by the Hotel to carry out the detailed design of the mechanical and electrical services within the new spa complex.
Ventilation, Electrical, Lighting, Heating and domestic plumbing were all designed and integrated within the new structure to form a minimalistic installation to suit the tranquillity of the spa complex.
A condensing boiler, underfloor heating and a heat recovery air handling unit were all installed.
Colour changing LED lighting along with a scene setting controller were also installed to allow the users to adapt the ambient lighting to suit the time of day or treatments offered.