GPJ Consulting Engineers were appointed by the university Estates Team to work alongside the other members of the project team to provide a fully designed Mechanical and Electrical installation for the new 1000 sqm Fox 4 Creative Arts Building.
Systems designed included a full ventilation system for all teaching spaces to comply with Building Bulletin 101. Underfloor heating was specified for all teaching spaces to offer a comfortable working environment whilst providing free wall space for art work display. All lighting is daylight controlled to provide a constant level of illumination whilst offering energy savings.
New high efficiency condensing gas boilers were installed. All of the ventilation and heating systems were controlled via a new building management system (BMS) to offer the client optimum control over the building’s operation with dedicated metering of gas, water, electrical and heating systems to provide an instantaneous view of the buildings energy usage.
All M&E installations were tailored to meet the requirements of BREEAM which achieved a Very Good standard upon building completion.
Quote or fact about the project could go here. Quote or fact about the project could go here.